Not important to school and kindergarten in Greenfield
Back to blogIn
The meeting of the Sector 1 Local Council of March 23, 2021, a
the draft decision on approval was debated and unanimously approved
technical-economic documentation and indicators
techno-economic aspects of the investment objective „Construction
educational complex composed of a school, kindergarten, pathways
traffic, green spaces, sports fields, playgrounds,
lighting fixtures, parking space, enclosure fence, Sector 1,
Bucharest.
This
Decision of the Local Council of Sector 1 practically consolidates the Impact D&C initiative
initiated in May 2020 by donating to the municipality a
land of 9,620 sqm, as well as the project and the entire
Technical documentation for building permits, donated by
along with a free title, totaling an approximate value of 1.75
millions of euros. According to the decision in question, the indicators
maximalize the investment objective„School and kindergarten
in Greenfield Residence”are worth 58,200,640.41 lei
including VAT, and the investment realization period will be 24
Monday, of which 20 months are for execution and four months for design.
I
a total built-up area of 7,558 sqm in
the total usable area will be 6,756.31 sq m, the future
educational center will be an integral part of a complex
constructions with various public functions developed on 2 plots
adjacent, I also made available to the municipality with the title
free by Impact Developer & Contractor: an STB terminal,
ISU subunit to serve the entire Northern area
Capital, etc. For the execution of these functions and elements of
Infrastructure, Impact Developer & Contractor has allocated a budget
of over 3 million euros (excluding VAT).

School
and the kindergarten in Greenfield Băneasa Complex will have direct access to a
will be public and will constitute modern educational spaces, where they will
teach approximately 1,000 children from the Northern area
Bucharest, as follows:
–
The kindergarten will have a height of P+1, an area
built with a surface area of 2,548.47 sq m, of which an area
a total usable area of 2,297.24 square meters and will be able to accommodate 150 children
15 classrooms plus a multipurpose room, a
event hall, a medical office + isolation room, an office/kitchenette
feeding, administrative spaces, technical spaces, gardens, and a
Indoor playground;
–
at a school with a height regime of P+2E+Eth and a surface area
constructed developed area of 5,009.53 sq m, of which an area
with a usable area of 4,459.07 sqm, two groups of
390 children in 13 classrooms, 5 laboratories (chemistry, biology,
physics, computer science, foreign languages), two workshops (music and
art room), 1 after-school room, 1 library, 1 gym +
vestibule, a multifunctional foyer, a speech therapy room, a
pedagogical counseling office, a medical office + isolation room, a
buffet space + food office, a school store, a courtyard
covered interior, an outdoor sports field, a courtyard
partially covered recreation area, a maintenance workshop, platforms
for bicycle parking, various technical spaces, and
administrative.
Now
pedestrian alleys and green spaces will not be neglected,
area of 3,572.09 sq m, and the allocated land area
common carriageway traffic, pedestrian traffic, and car parking
The bicycle will be approximately 1,305 sq ft.
Presence
school and kindergarten in the residential neighborhood in Northern Bucharest, Băneasa Greenfield, will thus favor sleep
extended by 30 or even 60 minutes and therefore more time
spent at home, with family. The most advantageous will obviously be,
children living in Greenfield. The action is a step towards
normality, as a result, parents will be able to enroll children
at these educational units and, why not?, perhaps even to
moves those learning in more remote centers, almost
homemade.